More Photos Inside the Rec Center

by   |  03.31.11  |  Construction, Photos, Pool

Sun streams through full-length windows overlooking the new leisure pool.

Photographer Steve Butman also toured the Royce and Pam Money Student Recreation and Wellness Center this month. Here are some of his photos of the work as it progresses.

The lobby of the center as viewed from the second-floor jogging track.

The showers and locker rooms are visible from the outside of the facility's northeast corner.

The leisure pool and window, looking north from the lobby area.

Crews pour cement on the second floor of the center. A portion of the jogging track is visible as it crosses in front of the east-face window.

The last portion of the second floor, where cement is being poured.

The south side of the facility, facing the Campus Center, as it was last week. Bricks now cover most of the west side, and crews have begun installing glass in the second-floor windows.