DSGN 442 – Design Project
Teams
- MSL – Melanie, Sara Beth & Lauren
- HAT – Haley, Al & Tana
- KSK – Kasi, Shannon & Kirsten
- BLNC – Briana, Lisha, Nicole & Chad
2012 Retail Design Institute Competition
For more information specific to the RDI Competition, please go here. There are some good Q&A documents that may help with design direction.
- Request for Proposals
- Allocation Program
- Updated First Floor Plan (dwg file)
- Updated Second Floor Plan (dwg file)
Programming Info/Pre-Design
- Project Information (Design Problem, Goal & Objectives, Space Allocation
- Research (Location, Competition/Positioning, Consumer Habits, Trends in Retail Design, Green Design)
- Code Review (Complete Checklist, Document Code Sections referred to)
- Case Studies
- Inspiration
Construction Drawings
- GN.00 – Cover w/Drawing Index (T.O.C.)
- GN.01 – General Notes, Code Info., Abbreviations, Accessibility Notes
- LS.XX – Life Safety Plans (first and second levels), Legends, Occupancy Schedule
- I2XX – Dimensioned Floor Plans (first and second levels), Legends
- I3XX – Reflected Ceiling Plans (first and second levels), Legends
- I4XX – Finish & Furniture Plans (first and second levels), Legends, Notes, Abbreviations
- I5XX – Interior Elevations
- I6XX – Wall Types and Sections
- I7XX – Millwork Details
- I8XX – Details
- Stair Plans and Section
Schedule & Deadline
Week 1:
- Thurs., Feb. 16: Introduce project and design teams
Week 2:
- Tues., Feb. 21: Precedent research and code review
- Thurs., Feb. 23: Discuss deliverables and schedule, Team meetings
Week 3:
- Tues., Feb. 28: Team meetings as required
- Thurs., Mar. 1: Programming document due
Week 4
Week 5 (Spring Break)
Week 6
Week 7:
- Tues., Mar. 27: Schematic Design due
Weeks 8 – 12
Week 13:
- Wed., May 9: Construction Drawings due